Specifications include, but are not limited to: mobilization and demobilization; best management practices (BMP); staking and survey monument restoration; traffic control plan preparation and implementation; clearing and grubbing, utility company coordination and utility verification; removal of existing roadway improvements, subgrade preparation, cold milling of existing asphalt pavement and PCC pavement; construction of asphalt concrete (AC) pavement, asphalt rubberized hot mix (ARHM) pavement, full depth pavement section repairs, PCC sidewalk, PCC driveway; PCC cross gutter and spandrels, PCC pavement, PCC curb and gutter, PCC curb, PCC curb ramps, PCC truncated domes on existing curb ramps; root pruning of existing trees and installation of root barriers; utility adjustments; streetlight relocation, installation of new traffic signal conduits and pull boxes, replacement of traffic signal loop detectors, installation of advanced loop extensions, and installation of new bike detector loop cables; traffic signage improvements, striping and painted curb improvements, repairs to impacted or damaged landscaping and irrigation system improvements; as-built plan preparation, and all other work required by the Contract Documents.