Specifications include, but are not limited to: The work shall include the installation of thirty-seven (37) “Drilled Pier” foundations in thirty-seven (37 ) unique locations in the City of Riverside. This portion of the project will not include any electrical structure installation or removal except as it is required for drilling and installing steel rebar and cages. Contractor shall provide miscellaneous materials, equipment and services to complete the installation as specified herein and in accordance with the Riverside Public Utility (RPU) (the “Company”) Contract Documents. The Work Scope includes all associated Work items and material required to perform the major Work items mentioned in City of Riverside, Riverside Transmission Reliability Project, Underground Civil Specifications in a first class professional manner