Specifications include, but are not limited to: The University of California, Riverside requests that qualified architects or engineers submit written Statements of Qualifications to provide programming, site planning, and design services for the following proposed project, as described below: SCOPE 1: Work Authorization for PSA to include: 1. Adequate and Stable Project Description for CEQA 2. Conceptual Design 3. Statement of Probable Cost. • Fixed 2.6-acre site for clearance and construction of one (1) C.U.P.S.* structure of approximately 90,000 square feet, with modified shipping container vestibule access. • Pole supports shall not overlap tree spacing HDPE product dimensions shall be taken into consideration. • Site access. • Site domestic water. • Site electrical. • Site irrigation. • Site storm water management.