Specifications include, but are not limited to: Remediation: Qualified contractor will remove all asbestos and lead as identified in provided surveys and submit all clearances, manifests, commissioning report, and closure packages as required. Demolition: Qualified contractor shall remove everything on the site per the contract documents, including, but not limited to, the building, slab, footings, and all underground utilities. All utilities have been turned off at site. A demolition permit is required (Exhibit A) prior to commencement of work. All miscellaneous concrete, asphalt, concrete patio and walkways, out structures, and irrigation lines are to be removed. Public sidewalks are to remain and repaired if damaged during demolition. Remove all trees, bushes, landscaping, and fencing located within the property lines. Contractor will be responsible for dust control during operation.