Specifications include, but are not limited to: 1. Mobilization, including, but not limited to: a. Bonds and insurance; b. Movement of personnel, equipment, supplies and incidentals to the project site; c. Establishment and removal of field offices temporary buildings, and other temporary facilities necessary for work on the project; d. Clean up; and e. Demobilization.Compliance with National Pollutant Discharge Elimination System (NPDES) General Permit. Furnish, install and maintain storm water pollution prevention including all supervision, labor, materials tools, equipment and incidentals to prepare, maintain and implement all work required for compliance with the requirements of the State Water Resources Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order #2009- 0009-DWQ), and any other related State, County or local requirements. 3. Obtain Permits from the City of Morgan Hill, including, but not limited to: a. Provide California Professional Civil or Structural Engineer stamped pre-engineered metal building drawings and calculations. b. Obtain Building Permit from the City of Morgan Hill. c. Obtain Encroachment Permit from the City of Morgan Hill. 4. Test, obtain necessary permits for, and remove approximately 850 cubic yards of potentially contaminated soil not to be reused on site to Class II or Class III landfill.