Specifications include, but are not limited to: The City of San Diego's Public Works Department (PW) - Construction Management & Field Engineering Division (CMFE) is responsible for providing construction management, inspection, material testing and land surveying services for public improvements and private land development which benefit the community, improve safety and comply with engineering standards. The City of San Diego is currently in the process of preparing construction documents for advertising for the construction of the Harbor Drive Trunk Sewer Replacement Project. It is the intent of the PW - CMFE to hire a Construction Management Professional to provide professional services under this contract.The existing sewer main in East Harbor Drive (Park Blvd. to south of Sigsbee St.), is in need of replacement and is over 50 years old. The Harbor Drive Trunk Sewer Replacement Project includes the improvements to the existing wastewater collection and trunk sewer lines that will provide the conveyance flow to the City of San Diego’s Pump Station #5 (PS#5) to accommodate the additional flows from the Ballpark Village Development (BVD) and other future developments within the southern portion of East Village in the City of San Diego. This project will consist of the following: Replacement of 1,044.93 LF of existing 12-inch ESVCP with 18-inch PVC Sewer main; Replacement of 279.18 LF of 12-inch ESPVC with 20-inch FPVC and 21-inch PVC under Santa Fe Railroad and Metro-Transit (MTS) ROW with Trenchless Methods; Replacement of 3,175.67 LF of 15-inch through 24-inch Techite pipe with 30-inch FPVC inside a 54-inch steel casing with Trenchless methods; Sewer Manholes, and all other appurtenances, curb ramps and street resurfacing as shown in the contract.