Specifications include, but are not limited to: • Removal of the existing floating cover and all appurtenances. • Inspection and repairs to the existing porous asphalt concrete liner. • Installation of new weight tensioned CSPE geomembrane floating cover including rainwater collection trough, four submersible rainwater removal pumps in PVC housing sumps, stainless steel access hatches, and stainless-steel vacuum vents. • The new floating cover will be anchored at the top of slope utilizing the existing perimeter concrete anchor anchors and batten bars. • Installation of buried PVC pipes across reservoir perimeter road at rainwater removal pump discharge points to route water directly to existing drainage ditches or existing buried storm drain pipes. • Installation of water quality sampling pumps at floating cover access hatches and water quality sampling hoses located on top of floating cover with sample tap at reservoir perimeter ringwall. • Removal of three existing 30-inch outlet butterfly valves located within the reservoir and replaced in kind with new 30-inch butterfly valves, actuators, and hydraulic power unit. • Electrical modifications.