0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 55 0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0005 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 13 0006 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 96 0007 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 19,200 0008 120165 CHANNELIZER (SURFACE MOUNTED) EA 27 0009 014002 PORTABLE SIGNAL SYSTEMS (LS) LS LUMP SUM 0010 120300 TEMPORARY PAVEMENT MARKER EA 260 0011 120320 TEMPORARY BARRIER SYSTEM LF 330 0012 015302 TEMPORARY BARRIER SYSTEM (LEAVE IN PLACE) LF 1,780 0013 013855 RELOCATE TEMPORARY BARRIER SYSTEM LF 4,360 0014 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0015 129108 TEMPORARY CRASH CUSHION TL-3 EA 6 0016 017673 TEMPORARY CRASH CUSHION TL-3 (LEAVE IN PLACE) EA 2 0017 130100 JOB SITE MANAGEMENT LS LUMP SUM 0018 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0019 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 4 0020 130331 STORMWATER ANNUAL REPORT EA 1