0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 7 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 120 0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM 0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0009 120120 TYPE III BARRICADE EA 120 0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 35,000 0011 120195 TRAFFIC DRUM EA 1,770 0012 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 1,000 0013 120300 TEMPORARY PAVEMENT MARKER EA 1,480 0014 120320 TEMPORARY BARRIER SYSTEM LF 278,000 0015 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0016 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0017 129011 MOVABLE BARRIER SYSTEM LS LUMP SUM 0018 129012 MOVABLE BARRIER CRASH CUSHION EA 52 0019 129013 LATERAL SHIFT OF MOVABLE BARRIER EA 52 0020 129108 TEMPORARY CRASH CUSHION TL-3 EA 60