Specifications include, but are not limited to: demolition of roof materials, demolition of all copper flashing, counter flashing, downspouts and gutters. Existing sheathing is to be protected and remain in place. Install CertainTeed TL/AR shingles, flexible sheet membranes for eave protection, underlayment, and valley protection, and install associated metal flashings and accessories per ASTM standards and in accordance with the Standard Specifications, Plans and Specifications (including but not limited to Appendix D Drawing Package and Part V Specification Package Division 07), and as directed by the City and Construction Manager. This project will require scheduling coordination with building occupants, including limiting noise during public meetings scheduled for inside the building. Contractor should account for six (6) four-hour long meetings per month. The City will provide a list of all scheduled meetings to the Contractor. City Hall is a historic building and shall remain open at all times; however, the contractor may close off and utilize the South parking lot during performance of the work.