Specifications include, but are not limited to: The project is the upgrade and expansion of the existing City of Clovis CNG fueling system located at the City of Clovis Corporation Yard. The project consists of the acquisition and installation of one new Compressed Natural Gas (CNG) compressor, six new Time fill posts, one new electrical control panel, a new compressor control panel, a new communication panel and the installation of one storage tank. The project includes all the electrical, communication, and gas work and all the site work and associated equipment to upgrade the existing CNG fueling system with the new facilities. The site work shall include, but not be limited to, removing a portion of the existing chain link fence and concrete curb, site demolition and grading as required, excavation and installation of concrete footings and equipment pads, trenching and installation of all the new gas, communication and electrical lines, trenching installation of new bollards and chain link fence and trench resurfacing.