Specifications include, but are not limited to: 1. Provide licensed surveyor for all layout and elevation staking for all site work. Surveyor must provide accurate layout and location of site work and be approved by CM/District. Erect and maintain benchmark and batter boards as necessary to provide accurate and complete control for all work. 2. Maintain perimeter fence such that a 6’ minimum secured chain link fence barrier is provided to enclose all areas under construction at the end of each working day. Provide additional temporary fence as necessary to erect or maintain perimeter fence. 3. Provide all site demolition, clearing and disposal, including but not limited to: oversized rubble, miscellaneous trash and debris, concrete, fence, asphalt, abandoned underground and above ground utilities, equipment or structures (where visible or where in conflict with new construction), trees, shrubs, ground cover per plans and/or specifications including Section 02230.