Specifications include, but are not limited to: The boiler will be drained and cooled prior to our crew's arrival • Check in with the customer per customer's protocol • Conduct Job Safety Analysis • Conduct Job Safety Brief prior to beginning work. • Prior to starting work, conduct appropriate lock-out/tag-out measures on all relevant lines. • Open the boiler fireside and inspect refractory on rear door, front inner door, throat and liner. • If required, drain the boiler. • Open the waterside hand holes, manhole, low water cut-offs, blowdown and feed water inlet to wash out all mud & loose scale. • If required, brush the tubes as needed. • Report on the condition of the tubes, tube sheet, interior of the boiler, and the feedwater lines/water columns