Specifications include, but are not limited to:The Project will construct a 63,000 GSF building addition to the Anderson School of Management. The new construction will comprise approximately 63,000 GSF of classroom, event space and administrative offices as well as the seismic upgrade of the 339,000 SF Parking Structure 5. The new building will have (1) 200-person auditorium and (3) 90-person classrooms, a central organizing atrium, and 200 person event space, and entrances at parking structure drop off as well as the Briskin Family Plaza. The seismic upgrade will include work on all levels of the occupied parking structure as well as new foundation work for the new addition, including lead paint abatement in the existing Parking Structure 5. Interior finishes will include carpet, linoleum and sheet vinyl flooring, paint and casework. The Project will provide telephone and communications connectivity conduit and cabling, cable television, and a security system at building entry doors. The scope of work will include limited building demolition, excavation and construction of new seismic sheer walls and foundation footings, concrete encasement of existing columns, and Fiber Reinforcement Polymer (FRP) strengthening; new building construction including elevators, a raked floor classroom, atrium(s) event space(s) and the Admissions and Dean's suite of offices, provision of domestic water, fire water, sewer, gas, electrical, audio/visual, security and telecommunications utilities; provision of paving, landscaping, irrigation, site drainage, parking structure waterproofing, a complete lighting plan; signage and graphics package; and installation of fire sprinkler and fire alarm systems. Additional work includes code review, waterproofing detailing and acoustic studies, daylighting, energy modeling and LEED™ certification.