Specifications include, but are not limited to: The Work consists of installation of steel cable guardrail along the outside of each aerial section between A-Line. Itincludes but not limited to, mobilization and maintenance of work area and Jobsite during constructiondemobilization and cleanup at the end of the project, cleaning, grubbing, removal and proper disposal of vegetation,objectionable materials, and debris at the area affect by construction, locating and marking existing re-bar aroundplanned anchor locations, installing concrete anchors and guardrail post assembly, install wire rope cable railing andattachment hardware to guardrail posts, design and construction of a template, made from wood frame and plywood,miscellaneous and incidental work.