Specifications include, but are not limited to: 1. Create Engineering & Permit Package including plans, working drawings and required stamped engineering suitable for the procurement of the building permit. 2. Provide all labor and material to remove and install three (3) 15 Ton Trane HVAC units on the roof of Almansor Court. 3. Set new units in place, on neoprene isolators, and secure with seismic restraints. 4. Modify as necessary and reconnect of the existing condensate drain piping. 5. Provide new fused disconnect switches. 6. Modify as necessary and reconnect to the existing high and low voltage electrical. 7. Provide new, duct mounted, smoke detector and relocate to the supply duct. 8. Provide all rigging, lifting and crane services. 9. Disconnect, remove and properly dispose of the existing equipment and spring mounts. Fabricate and install sheet metal platform caps.