The project consists of providing and implementing a traffic control plan; providing construction area signs; providing and implementing water pollution control plan; providing construction site management; sweeping streets; clearing and grubbing; notifying and coordinating with utility companies, schools, churches, businesses, and property owners; construction survey staking; performing roadway excavation and site grading; roadway milling and resurfacing; removing and disposing existing concrete, asphalt concrete, and gravel pathways and driveways; constructing concrete curb, gutter, sidewalk, driveway, pedestrian ramps, and pervious concrete sidewalks; removing tree(s); planting and maintaining new trees and shrubs; adjusting various utilities; Printed Set ....... $335.00 + tax & shipping Electronic Set ... $ 45.00 + tax Electronic sets are available by selecting Electronic Delivery as your delivery method and paying via credit card. Electronic sets are complimentary when ordering a printed set. MBE = N/A WBE = N/A DBE = N/A Estimated Cost: $11,200,000. Scope: The project consists of providing and implementing a traffic control plan; providing construction area signs; providing and implementing water pollution control plan; providing construction site management; sweeping streets; clearing and grubbing; notifying and coordinating with utility companies, schools, churches, businesses, and property owners; construction survey staking; performing roadway excavation and site grading; roadway milling and resurfacing; removing and disposing existing concrete, asphalt concrete, and gravel pathways and driveways; constructing concrete curb, gutter, sidewalk, driveway, pedestrian ramps, and pervious concrete sidewalks; removing tree(s); planting and maintaining new trees and shrubs; adjusting various utilities; reconstructing drainage inlets; replacing street light poles; installing Rectangular Rapid Flashing Beacons (RRFB); upgrading and relocating traffic signal appurtenances; signing and striping; furnishing and applying water; cleaning site; and constructing other related work necessary to complete said project. The project and its construction activities must include Best Management Practices to protect the environment. NOTE: Specifications Volume 1, dated January 1999, does NOT apply to this project.