Specifications include, but are not limited to: The work for ADP Airside Improvements, project 411001, includes but is not limited to the following: 1. Construction of proposed Terminal 1 apron 2. Construction of Taxiway A 3. Construction of East Remain Overnight (RON) parking apron 4. Shift and reconstruction of Taxiway B from existing Taxiway B4 to Existing Taxiway B6 to 400’ offset from runway 5. Shift of Taxiway B from Taxiway B6 to Taxiway B10 to 400’ offset from runway 6. Major items of work will include pavement demolition, utility demolition, grading and earthwork mass balancing, pavement base courses, concrete paving, asphalt paving, pavement marking, perimeter fencing and wall, jet blast fencing, storm drainage infrastructure, stormwater storage and reuse facilities, airfield lighting and signage, high mast lighting, utility infrastructure, and 12 kV power.