rehabilitation of sidewalk panels Citywide. The project includes the removal and reconstruction of sidewalk panels, removal and reconstruction of ADA curb ramps, replacement and adjustment of utility boxes and valves, trimming of tree roots under panels marked for replacement, tree stump removal as noted, complete tree removal as noted, and tree replacement as noted. The project to be constructed consists of the CONTRACTOR furnishing all materials, equipment, tools, labor, and incidentals as required by the attachments to this document, specifications, and contract documents for the replacement of buckled or lifted panels caused by underlying tree roots and other causes. The work includes but not be limited to: saw-cutting, excavation, removal and disposal of the old concrete panels; trimming tree roots; tree removal; setup and maintenance of temporary traffic control system for pedestrian circulation; replacement and/or adjustments of utility boxes & valve covers; and clean-up of the project area. There will be no separate design plans for this project. The construction of sidewalk panel is per the latest version of the Green Book. The CONTRACTOR shall also abate dust nuisance by cleaning, sweeping and sprinkling with water, or other means as necessary. The use of water resulting in mud on public streets will not be permitted as a substitute for sweeping or other methods. No discharge shall be allowed to be drained onto the storm drain system via the catch basin.