Specifications include, but are not limited to: •Location 1: Fill voids due to corroded pipe with cement slurry, pull through mandrel to smooth cement slurry, and cure in place pipe (CIPP) approximately 50’ of pipe. •Location 2: Install (3) new catch basins and extend existing pipe approximately 35’ to “T” dissipater. •Location 3: Replace existing catch basinwith Town Standard Catch Basin, replace existing property catch basin with Town Standard Manhole, and install detention system. Restore existing fence, landscaping, and shrubs. •Location 4: Replace catch basins with Town Standards. Fill voids with cement slurry, smooth pipe interior, CIPP approximately 33.5 LF of 12” CMP, and install approximately 30 LF of rolled gutter per Town Standard Detail C4.•Location 5: Remove existing pipe, extend trench drain 1 LF, and transition trench drain to rolled gutter per Town Standard Detail C4.