Specifications include, but are not limited to: slurry seal package includes mobilization, public notification, traffic control; hot-mix asphalt (HMA) patches and base repairs; concrete improvements, including curb ramp repalcements for ADA compliance, sidewalk and curb and gutter repairs; slurry seals and cape seals; and installing traffic striping, marking and markers. In general the work included in the rehabilitation and reconstruction package includes mobilization, public notification, traffic control; base repairs; concrete improvements, including curb ramp repalcements for ADA compliance, sidewalk and curb and gutter repairs; surface reconstruct requiring milling of asphalt concrete pavement and underlying subgrade materials; cold-milling asphalt concrete pavement, regrading of intersections to adjust cross slopes at crosswalks for ADA compliance; HMA paving and overlay; adjusting utility covers to grade, and installing traffic striping, marking and markers.