Specifications include, but are not limited to: rehabilitation of the pavement on Novato Blvd from San Marin Drive to westerly city limits, Redwood Blvd from Rush Creek Place to San Marin Drive and from San Marin Drive to Wood Hollow Drive, Wilson Avenue between Center Road and southerly city limits. The improvements will include construction of ADA compliant access ramps, removal and replacement of damaged concrete curb, gutter and sidewalk, pavement repairs consisting of asphalt concrete dig-out and patches, grinding of the existing pavement, placement of reinforcing fabric, hot mix asphalt overlay, replacement of pavement striping and markings, installation of new traffic signs, installation of a new crosswalk on Novato Boulevard which will include a median pedestrian refuge area, bulb-outs, and a rectangular rapid flashing beacon (RRFB) lighted crosswalk sign system, widening and rehabilitation of the existing asphalt path along the north side of Novato Boulevard to meet Class I Multi-Use Path and accessibility standards, and other items or details not mentioned above that are required by the plans, standard specifications, or these special provisions to be performed, placed, constructed, or installed