The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for: Project work includes dewatering the drainage canal, excavating the existing roadway and base material, removing the existing culvert, placing and compacting base material, placing a new culvert, backfilling and rebuilding the roadway, repaving, and restriping. Other items or details not mentioned above that are required by these Special Provisions shall be performed, placed, constructed, or installed in accordance with the Standard Construction Specifications and these Special Provisions. The construction, materials, and workmanship for items of work on the plans, but not specifically mentioned in these Special Provisions are referred to the Standard Construction Specifications for conformance.