0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 755 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 16 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 40 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 280 0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 600 0010 120110 FLASHING ARROW SIGN EA 1 0011 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 230,000 0012 120165 CHANNELIZER (SURFACE MOUNTED) EA 150 0013 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 16 0014 120300 TEMPORARY PAVEMENT MARKER EA 3,710 0015 120320 TEMPORARY BARRIER SYSTEM LF 54,600 0016 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0017 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0018 129105 TEMPORARY CRASH CUSHION TL-2 EA 14 0019 129108 TEMPORARY CRASH CUSHION TL-3 EA 14 0020 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 8