Work includes installation of new distributed control systems at Walnut Creek Water Treatment Plant (WTP), demolition of existing associated control system components and cables, furnishing and installation of a new PLC at Larkey Pumping Plant and connection to the SCADA Network, and performing related required work located on District property at 2201 Larkey Lane, Walnut Creek, Contra Costa County, California. Estimated cost of this work is between $2.5M and $3.5M. This project will require multiple trades and types of work; for example (note: this list is not all inclusive): demolition, saw-cutting, concrete coring, painting, bolting, electrical, HVAC, and other required work and trades. For additional description and information, see Document 00 41 01 – Bid Form, Document 00 41 05 – Description of Bid Items, Section 01 11 00 – Summary of Work, and the remaining contract documents.