A. Pickup bench at City Facilities shop at 336 Sanjon Road, Ventura. Apply two coats of MinWax Quick-Drying Polyurethane to (3) metal supports prior to assembly. Coat the IPE wood slats with tongue oil prior to installation. B. Route and install 2” x 10” Donor Brass Plaque provided by the Pier Into the Future Director through City Facilities. Plaques shall be installed with two-part epoxy. Each bench has two plaques centered on the top slat. Plaque(s) shall be installed within 15 calendar days of receiving the plaque(s) and work order. C. Assemble City-provided Pier Bench per manufacturer’s instructions. D. Transport pier donor bench to Ventura Pier and install in the designated location per instructions from Pier Into the Future Director and Facilities department. Bench shall be bolted to the pier deck boards with 3/8” X 3” length, stainless steel lag bolts and flat washers. Bench shall be installed within 21 calendar days after receiving the work order. E. Occasionally, a plaque may need to be installed or replaced on the bench that is installed on the pier. Plaque(s) shall be installed within 15 calendar days of receiving the plaque and work order. F. Removal of a pier donor bench from the Ventura Pier and deliver to City Facilities shop at 336 Sanjon Road, Ventura within 15 calendar days of the work order. G. Bench refurbishment - Remove pier donor bench from the Ventura Pier, disassemble, sandblast, repaint with primer and marine grade paint, reassemble and reinstall pier bench on the Ventura pier. Contractor shall provide estimated timeframe per request and approved by the Pier Into the Future Director and City Facilities. H. The work orders shall include the bench installation location on the pier, (a map will be provided), the Plaque donor name and installation location of the plaque on either the left or right side facing the front of the bench. Contractor shall confirm when the work is completed.