• Disconnection, reconnection, and testing of various utilities (electrical power, potable water, sewage, • Disconnecting the permanent gangway from the permanent float, lifting the permanent gangway and supporting the permanent gangway with a contractor-furnished temporary landing beam on the two supporting piles in the ferry basin, • Disconnecting and removing the existing permanent ferry loading float, • Transportation of the permanent ferry loading float to Mare Island Berth 7 during the duration of dredging activities, • Dredging and placement of sediments at an approved upland site, o Complete all work within the following work window: 22:00 November 7th, 2025, to 05:00 November 12th, 2025, so as not to interfere with ferry operations • Underwater Dive Inspection, and replacement, as required, of the anodes on the permanent loading float, • Disconnection and reconnection of the permanent float mooring chains, • Reinstallation of permanent gangway and float system, • Hydrographic surveys, • Restoration of all Contractor-disconnected utilities, • Providing insurance and licenses as necessary, including all other time and services necessary or incidental to providing a complete improvement according to the Contract Documents, and • providing all labor, tools and materials for a complete and working Project in conformance with the Contract Documents.