1. Provide all labor, materials, and equipment necessary to remove and replace the existing storefront door system. Remove and replace the existing concrete to ensure ADA compliance and complete all related work. 2. The Contractor is required to pull an encroachment permit from the City of Ukiah for the work in the City Right of Way. 3. The contractor shall provide a proposed work schedule within two (2) weeks of receiving the fully executed contract, addressing work limitations noted in Section 01500. 4. Provide all labor, material, and equipment to complete work as depicted in the drawings, as described in the project manual, or as necessary for a complete and proper installation. The extent of the work as indicated on the Drawings and as described in the Specifications shall include all that may be reasonably inferred to be required for the proper execution or installation of work. Present to the County, at the close of the project, signed copies of all required permits indicating successful completion of all permit requirements. 5. Should the General Conditions or Contract Documents contradict themselves, Contractor shall provide the more stringent or higher quality or quantity unless otherwise approved by the County. 6. The Drawings shall be recognized as diagrammatic in nature and not entirely descriptive of all requirements for construction. Whatever work may be specified, and not drawn, or drawn and not specified, is to be executed as fully as if described in both these ways; and should any workmanship or material be necessary which is not either directly or indirectly noted in these specifications, or shown on the Drawings, but is nevertheless necessary for the purpose of properly carrying out the obvious intention thereof, Contractor is to understand the same to be implied, and is to provide for the same in its bid, as fully as if it were particularly described or delineated.