Work to be done includes the furnishing of all labor, materials and equipment necessary for installing of City supplied traffic signal 332L cabinets with City Supplied 2070LX controllers, installing of City supplied battery backup cabinets, furnishing and installing battery backup systems, installing of new traffic signal cabinet foundations and removal of existing foundations, furnishing and installing of new vehicle detection systems and pedestrian push button systems, modifications to a SDG&E meter service, relocation of a traffic signal pole, modifying/installing pedestrians ramps, installing concrete pads around traffic signal controllers, installing wireless communication radios and ethernet switches and all related and necessary work as defined in the contract documents (the “Project”).