The project includes the following features: Resurfacing the Existing Track Surface-Includes surface preparation, patching, and application of new track surfacing and striping for athletic performance. Replacement of Synthetic Turf Field- Complete removal and disposal of the existing turf system, subgrade preparation, and installation of new synthetic turf with infill. Removal of Existing Scoreboard Assembly: Disconnection and removal of the current scoreboard and associated components. Installation of New Digital Display System Includes furnishing and installing a new ID panel, video display, scoreboard, and clock box on the exterior of the existing Parking Structure "C", with all necessary electrical and data connections.