Package 1 - Torpedo Building Preservation Improvements - Work includes removing and replacing existing corrugated metal roof and existing wood fascia trim, removing and repairing offsite all existing wood windows, trims, hardware and replace existing single glazing with new single glazing to match, remove existing barn doors and replace with new aluminum storefront frames and insulated windows and doors, install new plywood framed window protection cover attached to repaired windows. Refer to Bid Book Volume 2 of 3 for the technical specifications related to Package 1.; Package 2 - Pier E-2 Improvements - Reconstruction and expansion work of the Pier E-2 parking lot includes excavation, concrete curbs, gutters and sidewalks, pavement section, signing and striping, construction of a concrete utilidor to carry utilities, utility lines including storm, sanitary sewer including new lift station, potable water including fire hydrant, electrical and communication lines, connections to existing City systems, storm water treatment facilities, erosion control, landscaping, fences, gates and railing, and a pre-fabricated modular bathroom with drinking fountain. Refer to Bid Book Volume 3 of 3 for the technical specifications related to Package 2.