Specifications include, but are not limited to: Project consists of procurement and installation of theatrical lighting, light bars, cabling, programming of a lightboard for new theatrical lighting, installation of new electrical circuits and conduit, rework of existing lighting circuits, design and engineering of light bar attachment & coordination, submission and approval of structural details associated with project to the Division of State Architect, training of District Staff on new lighting; A. Each Item of Equipment and Each System: Contractor shall include description of unit or system, and component parts and identify function, normal operating characteristics, and limiting conditions. Contractor shall include performance curves, with engineering data and tests, and complete nomenclature, and commercial number of replaceable parts. B. Panelboard Circuit Directories: Contractor shall provide electrical service characteristics, controls, and communications. C. Contractor shall include color coded wiring diagrams as installed. D. Operating Procedures: Contractor shall include start-up, break-in, and routine normal operating instructions and sequences. Contractor shall include regulation, control, stopping, shut-down, and emergency instructions. Contractor shall include summer, winter, and any special operating instructions. E. Maintenance Requirements: Contractor shall include routine procedures and guide for trouble-shooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions. F. Contractor shall provide servicing and lubrication schedule, and list of lubricants required. G. Contractor shall include manufacturer's printed operation and maintenance instructions. H. Contractor shall include sequence of operation by controls manufacturer. I. Contractor shall provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.