As described in the Bidding Documents, the bids are for a public works project, Tapo Canyon-Rebecca Sewer Line Rehabilitation Project (Project), which consists of the rehabilitation of approximately 2,427 linear feet of existing 12” and 21” diameter pipes, with cured-in-place pipe (CIPP) lining, including installation of temporary sewage bypass pumps and sewage bypass piping systems, manhole steps removal, manhole cone removal and reconstruction, manhole cover and frame replacement, infiltration mitigation, mineral deposits removal, traffic control, and all appurtenant work. Specific details regarding the scope of work are provided in the Unit Bid Price Schedule page. Sewer segments are located in the public right-of-way. Contractor shall coordinate with private property occupants and obtain permission from private property occupants for access prior to starting work. The expected completion time of the Project is 60 calendar days when the City issues a Notice to Proceed.