0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM 0003 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 4 0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0005 100100 DEVELOP WATER SUPPLY LS LUMP SUM 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120120 TYPE III BARRICADE EA 1 0009 120151 TEMPORARY TRAFFIC STRIPE (TAPE) LF 620 0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 44,600 0011 120195 TRAFFIC DRUM EA 73 0012 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 264 0013 120300 TEMPORARY PAVEMENT MARKER EA 620 0014 120320 TEMPORARY BARRIER SYSTEM LF 20,000 0015 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0016 129108 TEMPORARY CRASH CUSHION TL-3 EA 5 0017 130100 JOB SITE MANAGEMENT LS LUMP SUM 0018 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0019 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 12 0020 130331 STORMWATER ANNUAL REPORT EA 1