Specifications include, but are not limited to: 1. Mobilization. 2. Traffic control, including Temporary Traffic Control Plan for work that requires diversion of traffic and/or travel lane closure, bike lane closure, or sidewalk closure. 3. Install 6-inch parking lane striping on both sides of Warner Trail between Fred Waring Dr. and Hovley Lane. 4. Install five (5) sets of City-owned temporary speed cushions on New York Avenue between Virginia Avenue and California Avenue along with providing all signing, striping, and pavement marking associated with the speed cushions in accordance with CA MUTCD (latest edition). ** 5. Install ladder-type high visibility crosswalks at the intersection of California Avenue and Warner Trail. 6. Install two (2) sets of City-owned temporary speed cushions on Santa Rosa Way between San Pablo Avenue and Portola Avenue, along with providing all signing, striping, and pavement marking associated with the speed cushions in accordance with CA MUTCD (latest edition). ** 7. Install two (2) sets of City-owned temporary speed cushions on Catalina Way between San Pablo Avenue and Portola Avenue, along with providing all signing, striping, and pavement marking associated with the speed cushions in accordance with CA MUTCD (latest edition). ** 8. Install 6-inch parking lane striping on both sides of Grapevine Street between Highway 74 and Portola Avenue. 9. Install four (4) sets of City-owned temporary speed cushions on Bursera Way between Highway 74 and Desert Lilly Drive, along with providing all signing, striping, and pavement marking. associated with the speed cushions in accordance with CA MUTCD (latest edition). ** 10. Install Advance Warning Markings for speed cushions in accordance with Figure 3B-31 of CA MUTCD (latest edition).** ** Contractor is to provide all traffic signs necessary to comply with CA MUTCD speed cushions installation requirements.