1. Levee repairs at Site 55 and Site 82: a. Mobilization and demobilization. b. Home Inspections. c. Developing staging and laydown areas as needed. d. Temporary fencing around all work sites, and staging areas. e. Traffic control and flagging for public safety. f. Installing and maintaining traffic detours in accordance with detour plans as required. g. Clearing and grubbing. h. Earthfill. i. Excavation and backfilling, and disposal of excavated material. j. Geotextile fabric. k. Launch rock. l. Agricultural soil on finished slopes and in voids in launch rock to form soil-filled rockfill. m. Surface treatment including seeding, agricultural soil, native topsoil, and erosion control fabric placement. n. Aggregate base resurfacing of the levee crown road. o. Instream woody material. p. Pole cuttings. q. Irrigation.