1 MOBILIZATION 1 LS 2 ALLOCATION 1 UP 3A CONTRACTOR SUPPLIED BIOLOGIST FOR CEQA MITIGATION REQUIREMENTS (SECTION 10-1.05) 1 UP 3B CONSTRUCTION SUPPORT TASKS - SWPPP COMPLIANCE - CONSTRUCTION ACTIVITIES STORMWATER MANAGEMENT PLAN (CASMP) - INTERIM EROSION CONTROL AND BMP'S 1 LS 3C CONSTRUCTION SUPPORT TASK - OFFSITE WATER ACQUISITION, TRANSPORTATION, AND STORAGE 1 LS 4 PROJECT SURVEY 1 LS 5 CLEARING AND GRUBBING (8.3 AC) 1 LS 6 RELOCATION OF EXCAVATED WASTE FROM REFUSE LIMIT POTHOLING AND CLEAN CLOSURE AERA TO RECONSOLIDATION AREA 12,500 CY 7A UNCLASSIFIED FILL/FOUNDATION FILL SOIL MATERIAL (19,600 CY + 2,300 CY TO MAKE GRADES) 22,500 CY 7B FOUNDATION SOIL LAYER PLACEMENT 305,000 SF 7C UNCLASSIFIED EXCAVATION 18,500 CY 7D IMPORT SOIL MATERIAL 6,200 CY 9A 60 mil LLDPE SUPER GRIP NET GEOMEMBRANE-SLOPE (PER DETAIL 1/D1) 212,000 SF 9B 60 mil LLDPE SUPER GRIP NET GEOMEMBRANE-DECK (PER DETAIL 2/D1) 84,000 SF