A. Contractor shall be in communication with State representative for half of the launch ramp to be closed and sectioned off for visitors can still safely use open side of launch ramps. Half of launch ramps shall remain open at all times for public to use. Both docks are located at the Sawpit Launch Ramp at the end of our boating parking lot, one on each side of ramp. B. Contractor is to fabricate and install a total of four new ramp sections and four new skids, all parts and material needed for completion (Docks to be fully operational). Connecting new sections of docks to old sections of docks along with connecting new skids to existing I beams on launch ramp. Installing new Galvanized chains and linkages from new skids to new dock sections with proper lengths and tension for full functional mobility of all ramps. Two ramp sections and two skids for each East and West dock. C. Contracts to supply all parts, materials (galvanized chain, linkages, etc.) equipment and tools needed to Fabricate skids and dock sections, connecting to existing docks and I beam to complete job. All existing skids, docks, chains and linkages (connections) to be replaced with new if needed or to be left if checked and insure are in safe operational condition. D. In completion all old and new skid, docks, chains, linkages working properly with full, safe mobility of install.