1. Pipe Bursting: Replace approximately 1,149 linear feet of existing sewer main using pipe bursting methods, upsizing from 10-inch to 12-inch diameter pipe to increase capacity. 2. CIPP Lining – Shelter Creek Project: Install Cured-In-Place Pipe (CIPP) lining in approximately 1,400 linear feet of 18-inch diameter sewer main. 3. CIPP Lining – Portola Project: Install CIPP lining in approximately 131 linear feet of 54-inch diameter storm drain. 4. Surface Restoration: Repair all sidewalk, curb, gutter, and ADA ramps displaced or damaged due to pipe bursting operations, at the discretion of the City inspector or engineer. 5. Utility Potholing: Perform exploration potholing near existing structures and utilities prior to pipe bursting activities. 6. Lateral Reconnection: Replace and reconnect all discovered sanitary sewer laterals not shown on the plans or previously identified. 7. Permit Coordination: Coordinate with Caltrans 8. Secure necessary permit per Section 01 41 00 (Regulatory Requirements). 9. Temporary traffic control per Section 01 51 00 (Temporary Facilities and Control).