Specifications include, but are not limited to: The objective of this Project is to replace the existing camera surveillance system currently installed with a non-proprietary fully integrates security control and monitoring system throughout the entire jail facility. The scope of work for construction includes the installation of an entirely new separate fiber-optic data infrastructure for the new security system applications. It is the County’s intent to replace the entire existing housing control security surveillance system with a modern, fully integrated security surveillance system featuring improved system reliability and serviceability, with the goal of reducing risk and increasing safety. This will also expand the capability of the jail’s Central Control unit to better monitor activities and allow all sub-control locations to communicate with each other as well as with Central Control. The new system will link Central Control directly to other areas of the facility, including the housing units, the kitchen, the laundry, and other miscellaneous areas, thus improving occupant safety, operational efficiency, and building security.