Make road improvements including slurry seal, patching, culvert replacement, and striping in up to eleven (11) sites. Site 1: 1. Painting includes : - 2030 feet of Broken center stripe - 1 Stop bar - 1 set of “Stop” lettering - 35 parking stalls - 40 feet of red curb - 345 sq ft of red cross lines - 3180 sq ft of “No Parking”/Cross lines 2. Total Slurry seal: 39,883 sq ft 3. Total asphalt patch: 1050 sq ft Site 2: 1. Remove and replace old culvert with new 18-inch corrugated Water-Tight, dual Wall, Smooth Interior (HDPE) storm drain culvert 2. Pipe length is approx. 35 - feet long, and is buried underneath main entrance road to campground 3. A 90% compaction is required for all backfill areas and trench. 4. New pipe and trench must be encapsulated with concrete slurry on entire length of pipe; slurry up to four-inches below road grade for new asphalt. 5. Contractor must have traffic control during construction and always have one lane open. 6. Restripe center line.