Specifications include, but are not limited to: The work necessary for the completion of this contract consists of the following items and all other incidental work items necessary to complete the work in place. General components of the project include: 1. Project preparation including design/build submittals 2. Clearing and grubbing with site erosion control 3. Weed grow and kill 4. Grading 5. Trash interceptor assembly on-site 6. Pile installation 7. Installation of trash interceptor system in creek and boom system 8. Construction of land-side components 9. Construction of rail system with winch and catwalk 10. Construction of solar power supply system 11. Construction of access gate, lighting, and security systems 12. System startup and testing 13. Installation of irrigation system 14. Planting and hydroseeding 15. Maintenance and plant establishment