The Project consists of an update to the library’s mechanical system at the first and second levels and minor interior alterations of the main library at the second level of the building. 1. The mechanical project scope includes, but is not limited to, coordination and integration of the new library mechanical system as designed by the mechanical engineer. This includes coordination in the ceilings, walls, and floors at the first and second levels of the library, as well as work on the roof to accommodate the new equipment and roof penetrations required for the new system. 2. The minor interior alterations scope includes, but is not limited to, demolition of nonstructural wall, revisions to casework/shelving and new casework/shelving, demolition of select casework/shelving, and new finishes. 3. Contractor will be responsible for prepping all areas for new scope of work, including patching and repairing existing conditions where affected by any and all demolition work.