Specifications include, but are not limited to: Conduit Infrastructure-Biometrics and Pelco. Hunt Construction Group is seeking statement of Qualifications from prospective Subcontractors to bid the Civil, Electrical and Low Voltage Packages for the Pelco Cameras scope and Biometrics scope that is part of the Airport Security Infrastructure Program at the San Francisco International Airport. The SFIA Airport Security Infrastructure Program consists of a new perimeter power and telecommunications duct bank, new fiber infrastructure, the expansion and migration of access control and closed circuit television systems and the build-out of new special systems rooms. The Conduit Infrastructure scopes of work will include the new installation of conduit homeruns for the replacement of approximately 470 Pelco PTZ cameras as well as new conduit homeruns to the BAA and BAG boarding gates to support the ongoing Passenger Processing Flow project at San Francisco International Airport. It is anticipated that there will be some Civil duct bank / trenching required for the new infrastructure on the perimeter buildings and Airfield. This is a campus wide upgrade and will include work in Terminals 1, 2, 3, the International Terminal, the Airfield and the perimeter buildings.