Specifications include, but are not limited to: SECURITY SERVICE Access within the gated area shall be controlled by security personnel. A list of authorized ADEQ personnel which are allowed to enter the fenced-in area will be maintained at the guard house. This list will be located in the security building and identify ADEQ staff members by their name and picture. Other personnel may only be given access to the fenced-in area while accompanied by an authorized ADEQ staff member, unless written authorization has been received by an ADEQ official. The guard must remain on site at all times. A physical security check of the perimeter must be conducted once every two hours. A log must be kept reflecting checks made. A log must be maintained of all person(s) entering or leaving the site. Guards must be knowledgeable of general orders and emergency procedures for site emergency (fire, vandalism, etc.). At the time service commences the contractor shall collaborate with ADEQ by preparing and providing a copy of the Post Orders that will govern duties and performance levels for Security Guards and Site supervisors assigned. Mutual agreement by client and contractor shall determine the final form and content of the Post Order. One notebook containing the Post Orders shall be provided to the post, and one to the Manager over Security for the Cedar Chemical Plan