The Consultant will develop roadway networks and transit networks for the Future Year, which is assumed to be 2050 for the purposes of the work plan. The initial roadway networks and transit networks should be based on the adopted 2024 RTP/SCS with other funded projects added as appropriate. The Consultant should anticipate the need to develop full documentation regarding which projects are included in the roadway network at the time of the initial model development including linkages to programmatic documents (RTP/SCS, WRCOG TUMF, CVAG TUMF, etc.) to disclose funding status to future users of the model. As with the Base Year model, this work plan assumes that the 2050 SED Data will be developed through a separate effort. Any review or update of this input land use data will be addressed through a separate effort. The Consultant will be responsible for obtaining jurisdictional concurrence regarding roadway networks and transit networks. The Consultant should anticipate that an extensive outreach effort will be required to obtain this concurrence from all of the Riverside County jurisdictions. Deliverables: • Draft & Final Year 2050 Roadway Network Maps • Draft & Final Year 2050 Transit Network Maps • Draft & Final Technical Memorandum documenting 2050 Roadway Network Funding Status • Draft & Final Year 2050 SED Data • Jurisdictional summaries of Year 2050 roadway networks, transit networks, SED Data with jurisdiction approval...