0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 67 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 120 0006 090214 SAFETY QUALITY CONTROL MANAGER LS LUMP SUM 0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,800 0010 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 1,800 0011 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3 0012 130100 JOB SITE MANAGEMENT LS LUMP SUM 0013 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0014 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 50 0015 141001 HEALTH AND SAFETY PLAN LS LUMP SUM 0016 141110 WORK AREA MONITORING (BRIDGE) LS LUMP SUM 0017 148005 NOISE MONITORING LS LUMP SUM 0018 480300 TEMPORARY SUPPORT LS LUMP SUM 0019 550102 (F) - STRUCTURAL STEEL (BRIDGE) LB 2,263 0020 590116 CLEAN AND PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS LUMP SUM