0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 355 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 8 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 353 0009 120110 FLASHING ARROW SIGN EA 9 0010 120120 TYPE III BARRICADE EA 12 0011 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 33,000 0012 120165 CHANNELIZER (SURFACE MOUNTED) EA 370 0013 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 58 0014 120300 TEMPORARY PAVEMENT MARKER EA 250 0015 120320 TEMPORARY BARRIER SYSTEM LF 7,660 0016 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0017 129100 TEMPORARY CRASH CUSHION MODULE EA 120 0018 129108 TEMPORARY CRASH CUSHION TL-3 EA 1 0019 129150 TEMPORARY TRAFFIC SCREEN LF 7,660 0020 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 9