0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 40 0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0005 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 30 0006 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0007 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0008 129161 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 30 0009 130100 JOB SITE MANAGEMENT LS LUMP SUM 0010 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0011 130730 STREET SWEEPING LS LUMP SUM 0012 820250 REMOVE ROADSIDE SIGN EA 2 0013 820750 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) SQFT 61 0014 820840 ROADSIDE SIGN - ONE POST EA 2 0015 820900 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST EA 5 0016 846012 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) SQFT 12,200 0017 846035 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3,690 0018 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS LUMP SUM