The City of San José (“City”) for the San Jose Mineta International Airport (SJC) is soliciting bids from qualified vendors to supply Level 3 (DC Fast-Charging) electric vehicle charging units at the SJC shuttle bus depot. These new charging units will replace existing 60kW output Level 3 (DC fast-charging) units on a one-for-one basis. Additionally, the City is soliciting installation, scheduled and unscheduled hardware and software maintenance support for supplied Level 3 (DC Fast-Charging) electric vehicle charging units. 2 General Requirement 2.1 Level 3 (DC Fast-Charging) electric vehicle charging units. 2.2 Vendor shall provide installation costs for supplied Level 3 (DC Fast-Charging) electric vehicle charging units. Installation is based on a one-for-one replacement of existing 60kW Level 3 (DC Fast-Charging) electric vehicle charging units with limited to no additional site prep or electrical infrastructure needed. 2.3 Vendor shall provide a Preventative Maintenance (PM) program that satisfies the items listed in section 2.4 of this scope of work, at a minimum interval of once every 6 months for each charging unit. 2.4 Vendor shall inspect and perform preventative maintenance work including but not be limited to the following: 2.4.2 INSPECT EXTERIOR: skin for dents, scratches, and other damage, door locking mechanism and/or disconnect for proper function and that all parts are present and undamaged, and the Emergency Power Off (EPO) and its surrounding guard for damage; EPO button should work and reset smoothly without rotation...